Patented Process

STADIUM SEAT RESTORATION

LATEST PROJECT HARD ROCK STADIUM MIAMI
$6.7M
CapEx Reduction
65,000
Seats Restored
ZERO
Revenue Downtime
15 YR
OEM-Quality Warranty
Trusted By
EPA APPROVED PROCESS

THE ELECTROSTATIC
ADVANTAGE

This isn't painting. It's advanced asset restoration. Our electrostatic coating process creates a molecular bond that's significantly stronger than traditional finishes.

Charged particles are magnetically attracted to the substrate, ensuring uniform thickness, zero overspray, and a finish that meets or exceeds OEM specifications.

Result: A restoration that looks new, performs better, and lasts longer—all at a fraction of replacement cost.

3X Stronger Bond
100% Coverage
ZERO Overspray
Electrostatic Process
Electrostatic application ensures complete, uniform coverage

The Strategic Alternative to Replacement

For major venue construction, the complexity and time required for seating replacement is a major threat to the budget and schedule. Our on-site electrostatic restoration process eliminates that risk and delivers massive CapEx savings.

78% AVERAGE CAPEX REDUCTION

Deliver massive savings back to the project budget. Realized as DIRECT VE SAVINGS (e.g., $6.7M saved at Hard Rock vs. $12.5M replacement cost).

ELIMINATE SCHEDULE RISK

Seat replacement takes 4-6 months. We finish in 4-6 weeks. We guarantee 100% OPERATIONAL CONTINUITY by working around events and other trades.

ON-SITE EXECUTION. ZERO DISRUPTION.

Forget removal, shipping, storage, and reinstallation costs and coordination. We work ENTIRELY ON-SITE. Seats remain in place throughout the process.

15-YEAR ASSET LIFE EXTENSION

Our electrostatic process delivers a finish that meets or exceeds OEM specifications, backed by a 15-YEAR WARRANTY. No callbacks.

Case Study: Hard Rock Stadium

The $6.7 Million Value Engineering Decision.

After Restoration
AFTER (OEM QUALITY)
Before Restoration
BEFORE (FADED/WORN)

When Hard Rock Stadium faced a $12.5 million seat replacement quote and a 6-month installation timeline, the project required a strategic alternative.

Our on-site electrostatic restoration delivered OEM-quality finishes without removing a single seat for $2.8M. The project was completed in 32 days with zero impact on scheduled events.

$9.7M
TOTAL CAPEX SAVINGS
65,000
SEATS RESTORED ON-SITE
$2.8M
PROJECT COST (VS $12.5M)
32 Days
PROJECT DURATION
0
OPERATIONAL DOWNTIME
15 YR
LIFECYCLE EXTENSION
VIEW MORE CASE STUDIES

SCHEDULE CONSULTATION

Get a detailed Value Engineering analysis, including a 10-year lifecycle cost comparison and project timeline analysis, showing exactly how much CapEx and time you'll save versus replacement.

DIRECT CONTACT: DAVID LYNCH, CEO